>> AEROCRETEEQUIPMENT
>> THE PRODUCTION LINE OF STEAM CURING EQUIPMENT
>> THE PRODUCTION LINE OF SAND
>> MINE CHOOSING EQUIPMENT
 

Technological flow of production of aeraten concrete

  First of all,dose and match stored raw materials(1)and feed them into pouring mixer,after evenly mixing(2)theyare poured (3)in the mould  to be reinforced by steel barsfor slabs(19) ,After pre-curing (4)under a certaintemperature for a period of time ,the blank shall have acertain of hardness .The mould and the blank shall be then hanger to the cutting machinery by the tilting hangerto fulfil following actions:a Tilting the mould 90in the air (5)(one side plate of the mould become the bottom to suport the blank until end product is handener );b.Hanged to the cart ,or the cutting support to open mould or demoulding(6);c.The demoulded frame and returned side plate shall be reorgeanized into the mould (16),and shall be ready for next pouring after cleaning and oil spraying (17)(18).The blank then be cut on the cutting machinery in six sides:a ,First two Vertical sides of the blank are cut(7):b.then the horizontal cutting longitudinally (8);c.And the horizontal cross cutting or chopper-like cutting at last (9),The cut blank and the bottom are hangen by the semiproduct hanger to the harening car(10).and fed into the autoclave in group to be hardened under high temperature(11)(12).After that ,end product leaves the autoclave (13)and is hanged by the end product  hanger to be stacked or loaded (14)and packed (15).The hardening plates are returned(16).

All rights reserved :GONG YI ZHUOLI MACHINE MANUFACTURING CO.,LTD.    Copyright 2006 Zhuoli China All Rights Reserved    
Tel:0371—64402258 64402398  Fax:0371—64402386
Website:http://www.zljxgs.com    E-mail:zhuoli@zljxgs.com